Infrastructure of the Waiern hospital in Feldkirchen
Infrastructure of the Waiern hospital in Feldkirchen
Safety and environmental protection from a single source
Construction project designation:
Waiern hospital access road – detailed road project / water legislation submission project: Bach von Metzing – stream adaption / construction supervision in accordance with the water legislation (ecological)
Execution period:
March 2015 and still ongoing
Project description: The Feldkirchen municipality needs an efficient and traffic-safe access road to the Waiern hospital and the newly built central kitchen of the Diakonie de La Tour. Our office carried out the detailed planning for the construction of the access road and its connection to the B83 Gurktalstraße. Since the road route to the Waiern hospital entrance, selected in the course of the variant study, is partly located at the existing stream of the Metzing brook, a water law submission project for the adaptation of the stream was prepared. In order to control the aquatic ecological points of contact in the water rights decisions, our office carried out the supervision of the construction in accordance with the water (ecological) legislation.
Project cost:
Approx. € 1,100,000.00