CCE Ziviltechniker GmbH (Infrastructure of the Waiern hospital in Feldkirchen): Safety and environmental protection from a single source

Print header

CCE Ziviltechniker GmbH: Logo

CCE Ziviltechniker GmbHParadeisergasse 12/2
9020 Klagenfurt

Phone: +43 463 57404
Fax: +43 463 57404 99
Mail: officeno@spamcce.co.at
Internet: www.cce.co.at

Branch office GrazDietrichsteinplatz 15

8010 Graz

Phone: +43 316 243811

Branch office WolfsbergSchießstattgasse 6
9400 Wolfsberg

Phone: +43 4352 30586

Print preview

MaximizeMinimize_

The preview pages may differ slightly from the printing due to individual terminal settings.

Print Page

CCE Ziviltechniker GmbH: Content, navigation

Infrastructure of the Waiern hospital in Feldkirchen

Infrastructure of the Waiern hospital in Feldkirchen

Safety and environmental protection from a single source
The picture shows a stream next to a road.
The picture shows a stream next to a road.
The picture shows a stream next to a road.
The picture shows a stream next to a road.
The picture shows a stream next to a road.
The picture shows a stream next to a road.
The picture shows a stream next to a road.
The picture shows a stream next to a road.

Construction project designation:
Waiern hospital access road – detailed road project / water legislation submission project: Bach von Metzing – stream adaption / construction supervision in accordance with the water legislation (ecological)

Execution period:
March 2015 and still ongoing

Project description: The Feldkirchen municipality needs an efficient and traffic-safe access road to the Waiern hospital and the newly built central kitchen of the Diakonie de La Tour. Our office carried out the detailed planning for the construction of the access road and its connection to the B83 Gurktalstraße. Since the road route to the Waiern hospital entrance, selected in the course of the variant study, is partly located at the existing stream of the Metzing brook, a water law submission project for the adaptation of the stream was prepared. In order to control the aquatic ecological points of contact in the water rights decisions, our office carried out the supervision of the construction in accordance with the water (ecological) legislation.

Project cost:
Approx. € 1,100,000.00