Feldkirchen Municipality
Flood protection in Feldkirchen
Regulatory area including a small hydropower plant implemented in the urban area
Construction project designation:
Feldkirchen flood protection / linear construction in the urban area
Execution period:
2015 - 2017
Project description:
In the city of Feldkirchen, the Tiebel river was expanded to a maximum flow capacity of 32 m³ / s (HQ30). The total length of the regulated area amounts to 1.6 km. Individual buildings along the stream were underpinned and some sections of the Tiebel river were redirected to a new riverbed. Four bridges with an insufficient flow cross-section had to be rebuilt. In addition, a division building was transformed into a small hydropower plant.
Project cost:
Total cost € 4,200,000.00