CCE Ziviltechniker GmbH (Bad Kleinkirchheim power plant): A vibrant place needs a secure energy supply

Print header

CCE Ziviltechniker GmbH: Logo

CCE Ziviltechniker GmbHParadeisergasse 12/2
9020 Klagenfurt

Phone: +43 463 57404
Fax: +43 463 57404 99
Mail: officeno@spamcce.co.at
Internet: www.cce.co.at

Branch office GrazDietrichsteinplatz 15

8010 Graz

Phone: +43 316 243811

Branch office WolfsbergSchießstattgasse 6
9400 Wolfsberg

Phone: +43 4352 30586

Print preview

MaximizeMinimize_

The preview pages may differ slightly from the printing due to individual terminal settings.

Print Page

CCE Ziviltechniker GmbH: Content, navigation

Bad Kleinkirchheim power plant

Bad Kleinkirchheim power plant

A vibrant place needs a secure energy supply
The picture shows the enclosure of the power station on the left bank of the Twengbach river
The picture shows the enclosure of the power station on the left bank of the Twengbach river
The picture shows the enclosure of the power station on the left bank of the Twengbach river
The picture shows the enclosure of the power station on the left bank of the Twengbach river
The picture shows the enclosure of the power station on the left bank of the Twengbach river
The picture shows the enclosure of the power station on the left bank of the Twengbach river
The picture shows the enclosure of the power station on the left bank of the Twengbach river
The picture shows the enclosure of the power station on the left bank of the Twengbach river
The picture shows the enclosure of the power station on the left bank of the Twengbach river
The picture shows the enclosure of the power station on the left bank of the Twengbach river
The picture shows the enclosure of the power station on the left bank of the Twengbach river

Construction project designation:
Twengbach power plant at the Kleinkirchheim river

Execution period:
2015/2016

Project description:
From the weir system with a flap and a fish ladder on the Kleinkirchheim river, the stream water is directed into the nacelle via approx. 600 m long pressure pipes. By means of the turbines, an electrical power of approx. 520 kW is reached and fed into the local power company network.

Project cost:
Approx. € 2,600,000.00